The Number You Get at Concept Is Not a Price

Every luxury project starts with a figure produced before the design is resolved, and everybody treats it as a budget. We would rather give you an honest range and the three decisions that will move it than a precise-looking number that cannot survive a finished set.

Bring the drawings at whatever stage they are. An honest range and the decisions that move it, before anyone quotes.

ValleyHalf the water on the roof runs hereWall flashingWhere a roof meets a wallPenetrationsVents, stacks, skylightsEaveWhere wind lifts first

Four places account for most South Florida roof leaks. None of them is the middle of the roof.

Licensed

General contractor, licensed in the state of Florida

Self-perform

Dewatering, SOE and deep foundations in house

Leadership

Delivered Fifth Avenue and Central Park West interiors

Open book

Where the contract is cost-plus, the books open

The difference

How we work differently

The number before the drawings are finished is not a price

Every luxury project starts with a figure produced before the design is resolved, and everybody treats it as a budget. It is a range with a design attached. We would rather give you an honest range and the three decisions that will move it than a precise-looking number that cannot survive contact with a finished set.

We self-perform the ground

On a waterfront Florida lot the water table, the seawall and the soil decide the schedule. Most builders subcontract dewatering and support of excavation. We do them ourselves, which is why our programs tend to survive the first month.

Attribution we can defend

Our leadership has delivered interiors at the Pierre, 15 Central Park West, 812 and 1136 Fifth Avenue and 730 Park Avenue. That is leadership experience, delivered before and alongside this firm. We say so plainly rather than implying the company built them.

Allowances are where luxury budgets die

A contract full of round-number allowances for stone, millwork and fittings is a contract that will grow. We price real selections or we tell you the allowance is a placeholder and roughly what it will actually cost.

Start here

Start a preconstruction conversation

Bring the drawings at whatever stage they are, and the survey if you have one. You get a range, the decisions that move it, and an honest read on the site.

If a production builder would serve this project better, that is what you will be told.

FAQ

Common questions

What does it cost per square foot?
A range too wide to be useful without the site and the drawings. Anyone quoting one before seeing both is guessing.
Fixed price or cost-plus?
Both work. A fixed price against unresolved drawings works for nobody, and we will decline that rather than pad the number.
How long does a custom home take?
Well over a year for a substantial house. Permitting and long-lead items usually consume more of the program than construction does.
Do you self-perform anything?
Dewatering, support of excavation and deep foundations. On a Florida waterfront lot that is the work most likely to decide the schedule.
Did Romco build the Fifth Avenue projects?
Romco leadership delivered that work, before and alongside this firm. We say so explicitly rather than implying company history.
Why are three builders' numbers so different?
Usually scope and allowances rather than efficiency. Compare what is included before comparing totals.
What goes wrong most often?
Allowances set as round numbers, and owner decisions made late. Both are avoidable and both are decided before construction starts.
Are you the cheapest?
No. There are builders who will hand you a smaller number now and find the difference in change orders later.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.