What we build · Whole-House Renovation

Renovation — Where the Unknowns Live

Renovating an existing house is harder to price than building a new one, because a meaningful part of the scope is behind finishes nobody has opened.

Bring the drawings at whatever stage they are. An honest range and the decisions that move it, before anyone quotes.

Licensed

General contractor, licensed in the state of Florida

Self-perform

Dewatering, SOE and deep foundations in house

Leadership

Delivered Fifth Avenue and Central Park West interiors

Open book

Where the contract is cost-plus, the books open

You are pricing a building you cannot see

Original plumbing, aluminum or undersized wiring, undocumented past renovations, structural changes made without permits, asbestos in older finishes, and rot behind a bathroom wall — every one is common and none is visible at estimate. A renovation price without an explicit allowance for concealed conditions is a number that will change.

What we open before pricing

  • Selective demolition at estimate stage where the owner will allow it.
  • Permit history, which reveals what was done without one.
  • Electrical service capacity, frequently the hidden ceiling on modern systems.
  • Plumbing material and age — cast iron and polybutylene both have a clock.
  • Structural changes from previous work, especially removed walls.

How we handle it

  1. 01Pull the permit history before pricing anything.
  2. 02Selective demolition where possible, so the estimate has evidence behind it.
  3. 03A stated concealed-conditions allowance, not a hopeful fixed price.
  4. 04Sequence to keep the house weathertight and secure throughout.
  5. 05Bring systems to current code where the work triggers it.
  6. 06Punch, turnover, warranty walk.

The permit history is one of the cheapest and most revealing documents available, and almost nobody pulls it. A house with a 1998 addition and no permit for it is telling you something important about what you will find in that wall.

Said plainly

Where we stop

If a house needs everything — roof, systems, structure, envelope — there is a point where renovation costs more than a rebuild and delivers less. We will run that comparison honestly even though the renovation is the bigger contract for us.

FAQ

Common questions

Why can you not give me a fixed price?
Because part of the scope is behind finishes. We can fix most of it and carry an explicit allowance for the rest, which is honest rather than evasive.
Should I renovate or rebuild?
If it needs roof, systems, structure and envelope, rebuild is often cheaper and better. We will run the comparison.
Can we live in it during the work?
On a whole-house renovation, rarely. On a phased one, sometimes. We will be honest about which.
What about asbestos?
Testing before demolition on older houses is routine and required. It is a cost and a schedule item, not a disaster.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.