Waterfront — The Lot Is the Project

On a waterfront lot the building is often the straightforward part. The water table, the seawall, the flood elevation and the permitting are what decide the program and a large share of the cost.

Bring the drawings at whatever stage they are. An honest range and the decisions that move it, before anyone quotes.

Licensed

General contractor, licensed in the state of Florida

Self-perform

Dewatering, SOE and deep foundations in house

Leadership

Delivered Fifth Avenue and Central Park West interiors

Open book

Where the contract is cost-plus, the books open

Everything upstream of the slab

Groundwater is tidally connected and moves twice a day. The seawall may be at the end of its life and is frequently shared with a neighbor. Flood elevation drives the whole ground floor. And the permitting can involve agencies well beyond the building department. None of that appears on the architect's renderings, and all of it comes before anything visible is built.

What has to be resolved first

  • Seawall condition and ownership — frequently shared, frequently ambiguous.
  • Flood elevation and freeboard, which sets the finished floor.
  • Tidal groundwater, which changes the dewatering design completely.
  • Dock and marine permitting, on its own much slower timeline.
  • Substantial improvement rules, which a large renovation can trigger.

How we handle it

  1. 01Survey the seawall and establish ownership before design is fixed.
  2. 02Confirm flood elevation and the freeboard the jurisdiction requires.
  3. 03Model tidal groundwater — we self-perform this rather than subcontract it.
  4. 04Start marine permitting early, because it will not be quick.
  5. 05Build, with the ground works as part of our own scope.

Salt changes the specification everywhere, not just at the waterline. Concrete cover, reinforcement protection, fixings, hardware, HVAC coils and exterior finishes all have marine specifications, and the difference between a coastal and an inland specification shows up in year six rather than year one.

Said plainly

Where we stop

If the seawall is failing and the budget does not cover it, we will say so before design proceeds. Building a house behind a seawall at the end of its life is spending money in the wrong order.

FAQ

Common questions

Who owns the seawall?
Frequently ambiguous and often shared. Establish it in writing before design is fixed — it is a title question, not a construction one.
What is substantial improvement?
A rule that can require the whole structure to be brought to current flood standards once a project passes a value threshold. It catches large renovations.
Does salt really change the spec?
Everywhere. Concrete cover, fixings, hardware, HVAC. The difference appears in year six, not year one.
How long is marine permitting?
Longer than building permitting, and on a separate track. Start it first.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.